Hi Guys,
During the production manufacturing phase we quite often have to update the routing with additional operations.
Today this is done manually and can be time consuming plus typo errors can occur.
I've create my Ref operation set which I would like to assign to the released production order which already has the standard routing.
TCODE CO02 --> operation overview --> select operation line -->edit --> insert Ref. operation set
Error message:
Ref. operation set 50000012 is not valid according to the selection conditions
Message no. CO892
Diagnosis
The selected reference operation set 50000012 is not valid on 22.12.2014.
System Response
If default values have been maintained in Customizing, an operation is generated automatically.
Procedure
Check why the reference operation set does not meet the selection conditions:
- 1. Is it valid on 22.12.2014? -->Key date is valid
- 2. Is lot size within its validity area? -->Lot size is valid
- 3. Is the selection ID for routing selection (Customizing: order type- dependent parameters) of a type that allows reference operation sets to be selected? --> Can you reference both types of routing for a single order type in TCODE OPL8?
- 4. If the reference operation set has a change number, is it valid for production on 22.12.2014? --> Key date is valid
Has anybody managed to get this to work before or have you an alternative method to record variances without having to manually create each step?
Regards
Paul